After the detection of the failure of the repair, the crane is designed to restore the crane to the state of its intended function. In time to repair the known failure may reduce the possibility of an emergency, usually by the provisions of mandatory.
Partial transformation is a relatively simple and economical method for increasing the latest features and techniques on the existing bridge crane. Common partial transformation includes lifting hoist and component replacement, variable speed control, wireless remote control and LED lighting device. Compared with the full transformation, the local transformation requires less planning and downtime for the earlier period.
ServiceService support
ADD: Shanghai city Songjiang North Pine Industrial Zone No. 295 building 3 land Times Building 6 buildings,201613
TEL: 0086-21-37820887
FAX: 0086-21-51685076
WEB: www.hevy.com
Email:sales@hevy.com