When the old equipment and the production requirements of a serious mismatch occurs, often need to complete the overall transformation of the old equipment. As an alternative to the replacement of the existing crane, the transformation of the existing crane to achieve a comprehensive transformation. Common transformation including the replacement of hoist, car, operating personnel cab and control device, in order to achieve the purpose of increasing capacity, speed, load or load control.
ServiceService support
ADD: Shanghai city Songjiang North Pine Industrial Zone No. 295 building 3 land Times Building 6 buildings,201613
TEL: 0086-21-37820887
FAX: 0086-21-51685076
WEB: www.hevy.com
Email:sales@hevy.com